Team 0265 · Matt Dale

GreenSpark Challenge 1 · Master Demo & Deal Directory

All Live Websites, V2 Project-First Rebuild, 4-Tab SWIS Engine, Lifecycle Blueprints & Audit-Clean Deal Sheets
★ Launch Tom's V2 Project-First App ↗ ⚡ Launch 4-Tab SWIS Grid Engine ↗
🖥️ Live In-Page Preview: zenith-project-first.html
Open Full Tab ↗

Recommended Flow for Your Session with Tom Friberg

Step 1: Show the V2 Project-First Rebuild (built directly from his email feedback) → Step 2: Show the 4 Audit-Clean 2-Page Deal Sheets → Step 3: Show the SWIS Constraint & Lifecycle Blueprints.

1 V2 Project-First Opportunity Engine (Built From Tom's Email Feedback)

Flips Company-First → Project-First · Separates 121 SPV Shells from 236 Developer Brands
Public Customer-Testing Edition Zero Zenith IP

Public V2 — Stripped-Down Project-First Engine

Identical 4-step Project-First workflow and SPV shell unmasking, but 100% stripped of Zenith Energy references, microgrid sizing rules, and confidential criteria.

  • Built specifically to screen-share next week with WA developers, civil engineers (JDSi, Colliers, TABEC), and civil contractors (Wormall, RJV).
  • Validates the multi-vertical B2B SaaS model without leaking Zenith's strategy.
Open Full Screen ↗

2 Live Deployed Cloudflare Websites (aiperth.co) + Local V1 Backups

The live URLs emailed to Tom + instant local copies
Cloudflare Access OTP Live Domain

zenith-wa-developer-intelligence.aiperth.co

The live Cloudflare email-OTP protected V1 portal sent to Tom Friberg, plus a 1-click local copy so you don't have to wait for an email code during your meeting.

Public Customer Testing Live Domain

wa-developer-intelligence.aiperth.co

The live stripped-down public WA Developer Intelligence website deployed for non-Zenith customer interviews across WA property & engineering verticals.

NSW Twin Live Site Live Domain

grokbotnswtwin.aiperth.co & aiperth.co/nsw-proof

Live deployed New South Wales cross-registry buyer-unmasking proof of concept (showing free NSW Valuer General + Planning Portal + ASIC/ABR matching).

3 4-Tab Zenith Connected Energy Opportunity Engine (SWIS Grid + 1,495 Estates)

106 SWIS Substations · 5 Reverse-Engineered Reference Microgrids · Two-Pipe Landgate + DAP Matcher

4 Audit-Clean 2-Page Deal Sheets (Page 1 Story & Constraint + Page 2 Maths)

Every ACN Modulus-10 verified · Every MVA & $ figure tied to primary filings & Slide 4 Excel cells
Deal 01 · Score 91/100 2-Page Deal Sheet

Deal 01: East Wanneroo Precinct 8 ("Ranch Road", Mariginiup)

Qube Property Group · Engineered by JDSi. 2,500 dwellings / 13.50 MVA hitting JDSi's published 8.0 MVA single-feeder cap while Wanneroo ZS is overloaded to 2030. Pitched as 3 × 4.50 MVA staged microgrids.

Deal 02 · Score 87/100 2-Page Deal Sheet

Deal 02: 201 Stock Road, Bullsbrook (180 ha Industrial)

Troon Group ($79.8M purchase across ACN 697 850 221). Targeting early-2027 Stage 1 release vs Western Power feeder MUC 536 needing 16.4 km cable by 30 June 2028.

Deal 03 · Score 94/100 (#1 Fit) 2-Page Deal Sheet

Deal 03: Lakefarm Retreat Urban Precinct, Ballajura (MRS 1441)

Land Group WA (ACN 683 136 969) · Engineered by Colliers. Gazetted 13 Mar 2026, 53.6 ha, ~776 dwellings (4.19–7.28 MVA — fits a single <10 MW microgrid at full build!).

Deal 04 · Score 68/100 (Watchlist) 2-Page Deal Sheet

Deal 04: Peel Corridor Early-Sensor Watchlist (Coodanup + Pinjarra)

Waterways Coodanup (ACN 691 013 297, EPBC 2026/10595) & BMP Land Projects Pinjarra (ACN 701 553 433, GST activated 19 Aug 2026) on the Mandurah→Pinjarra load-transfer squeeze.

5 Visual Reverse-Engineered Microgrid Lifecycle Blueprints (HTML + Landscape PDFs)

Traces Peel (EDL7), Ocean Reef (EDL9), Eglinton (EDL10) & Knutsford from Day-0 Land Assembly to ERAWA Licence
Interactive HTML Blueprint

Master WA Microgrid Lifecycle Blueprint (Figma-Style Board)

Visual end-to-end map showing the 6-gate timeline from ASIC SPV & Rezoning → Engineering Gatekeeper → Western Power 8 MVA Feeder Wall → Zenith BOO Microgrid.

Case Study Blueprints (PDF + HTML)

Individual Reverse-Engineered Case Studies (Peel, Eglinton, Ocean Reef, Knutsford)

Detailed landscape blueprints for each of Zenith's live WA reference microgrids and how our upstream sensors catch the next ones earlier.

Interactive Step-by-Step Widget

Interactive Reverse-Engineered Lifecycle Explorer Widget

Click through each gate of the WA property-to-microgrid lifecycle with exact statutory lead times and sensor triggers.

Open Widget ↗

6 New South Wales Buyer-Unmasking Proofs (Local Editions)

Proves how free NSW Valuer General + Planning + ASIC/ABR data unmasks anonymous SPV buyers
Latest Verified Build

NSW Buyer-Unmasking Proof (Latest Verified Edition)

Shows how 29 NSW commercial/industrial land transactions are cross-matched across NSW Valuer General sales, NSW Planning Portal DA/SSD filings, Endeavour Energy constraints, and ASIC/ABR.

Open NSW Proof ↗
Interactive Explorer & Redesigned Editions

NSW Proof Explorer & Sales-Ready Redesign

Interactive record-by-record explorer and the sales-polished presentation version of the NSW buyer-unmasking engine.